Is Your ‘100% Utilisation’ Actually a 0% Progress Issue?
Your Slack/Teams is a “Coordination Tax” nightmare.
Everyone is “busy,” yet those board-level milestones feel further away than they did at the start of the quarter.
This is the Utilisation Trap
Running a team at 100% (or close to) capacity doesn’t maximize ROI - it guarantees a queue.
Think of it like a motorway:
- 60% Utilisation: Cars move at the speed limit. High throughput.
- 100% Utilisation: Nobody moves. You don’t have efficiency; you have a traffic jam.
“If your team is ‘firefighting’ today, it’s not a talent problem. It’s a system one.”
The Solution: Less Push, More Flow
If you find yourself constantly asking for more “hustle,” you are likely treating the symptom rather than the cause. You don’t need more “push”; you need WIP (Work In Progress) Limits.
The Reality Check
- ❌ 100% Utilisation = Burnout, bottlenecks, and stalled milestones.
- ✅ Optimised Flow = Buffer for creativity, faster shipping, and actual ROI.
The Verdict
- ❌ Stop the sprint.
- ✅ Fix the flow.
Stop measuring how busy people are, and start measuring how quickly value gets out the door.
Don’t guess on capacity limits. Download the calculators here.